FT FinToolSuite

Goal deadlines

Cost of Delay by Goal Deadline (How Waiting Raises the Bar)

If you need a certain amount by a fixed date, delaying can mean fewer monthly contributions and fewer months to compound in a model. Here’s how that can raise the estimated monthly amount and how to test it safely.

Published: December 22, 2025 · Updated: December 22, 2025 · By FinToolSuite Editorial

Model deadlines in the calculator

See how start-now vs start-later changes the trajectory toward a target date.

Disclaimer

Educational purposes only; not financial advice. Examples are illustrative; real returns vary and investments can go down as well as up. Fees, taxes, inflation, and rules vary by country/provider. Deadlines and goals are personal; this is a planning aid, not a promise.

Quick answer

Same goal and deadline with fewer months usually means a higher modeled monthly amount. Higher assumed returns can lower that amount, but they are not guaranteed.

How much more per month if I start late?

The deadline math intuition

  • If you wait, you make fewer payments (when contributing monthly).
  • Each payment also has less time to compound.
  • That usually means contributing more per month or extending the deadline—modeling only, not advice.

Illustrative goal setup

Goal: £25,000 in 5 years. Assumed return: 5% (illustrative). We compare starting now vs waiting.

Start delay Months contributing Estimated monthly amount Takeaway
Start now 60 ~£368 Baseline illustration.
Start in 12 months 48 ~£472 Fewer months → higher monthly amount.
Start in 24 months 36 ~£645 Short timeline → much higher monthly amount.

These numbers use a simple monthly-contribution model for illustration. Use the goal monthly amount guide to calculate your own figures, then visualize timing in the Cost of Delay Calculator.

How to run your numbers

  1. Use the goal monthly amount guide/tool to find the required monthly amount for your goal and deadline.
  2. Re-run with a delayed start (fewer months) to see the higher monthly amount.
  3. Use the Cost of Delay Calculator to visualize start-now vs start-later under the same assumptions.

Catch-up framing

If you delay, the usual levers in a model are: increase monthly amount, extend the deadline, or test different assumptions (not guarantees). Explore more in the catch-up and “start late” guides.

Common mistakes

  • Treating the assumed return as guaranteed.
  • Forgetting inflation can raise the goal cost over time.
  • Changing multiple variables at once, making comparisons unclear.
  • Comparing different deadlines or horizons unintentionally.

FAQ

Does delaying always increase the required monthly amount?

With the same goal and deadline, fewer months usually mean a higher modeled monthly amount.

How much does delaying by 1 year change the monthly amount?

In the illustration, waiting 12 months raises the monthly amount from ~£368 to ~£472. Your numbers will differ—test them.

What return assumption should I use?

Try low/base/high scenarios to see sensitivity. Keep the same assumptions when comparing different start dates.

Can I extend the deadline instead of increasing contributions?

Extending the horizon is another lever in a model. Compare both approaches to see trade-offs; neither is a guarantee.

Do fees, taxes, or inflation matter?

Yes. They reduce net outcomes. You can approximate by testing a lower “net” return alongside your baseline.

Are results guaranteed?

No. All outputs are estimates based on assumptions. Real returns can be higher, lower, or negative.

What if my contributions aren’t monthly?

Adjust cadence in your model or convert to an equivalent monthly estimate to compare timelines.

How can I compare multiple start dates quickly?

Run separate scenarios (start now, +12 months, +24 months) with the same goal, rate, and deadline, then review side-by-side.

Next steps

Run three deadline scenarios: start now, start in 12 months, start in 24 months. Then compare the required monthly amounts and the opportunity cost charts side-by-side.